Green Formwork System
A High Performance Concrete Formwork System for PT Slab.
Luriel Green Formwork System
Prop Shoring Formwork System For Concrete Structure
What is Concrete Formwork?
Formwork is the structure, usually temporary, used to contain poured concrete and to mould it to the required dimensions and support until it is able to support itself. It consists primarily of the face contact material and the bearers that directly support the face contact material.
What is Luriel Green Formwork System?
Speaking about the formwork for concrete, there are different type of Concrete slabs in concrete construction.
This slab formwork system, called green formwork system, is based on several basic functionalities. Well at the same time, the early stripping also called early striking mechanism help a lot on site for concrete structures.
Luriel Green Formwork System is an advance concrete slab formwork system, which contains steel/aluminium framing with bamboo plywood inside, high load capacity with class B props as the shoring system,which meets the general requirments. It is also a steel panel prop formwork system which allows early striking operation att the same time,it could also be considered a formwork system with early stripping /early striking system to boost the construciton schedule for concrete structure and component.As the updated version of table formwork, it grows high installation efficiency for post tension slab project.
System Overview
For post tension slab project, green formwork could fully adopt its advantages to make sure that it could boost the construction schedule. At the same time, satefy in cite is also the top priority, this system is designed based speed,safety and environmental friendly.
Features
Safe, Efficient, Environmental Friendly
Only Panel,Prop and Infill Beam
With early stripping mechanism, it only requires 1 set of panel plus 2 sets of props to maintain the operation in good status.
High Early Stripping Performance
With early stripping mechanism, it only requires 1 set of panel plus 2 sets of props to maintain the operation in good status.With that the construction schedule could be boosted at least 2 times.
Easy to Infill
The area aournd the column and wall could use the infill beam of green formwork with the traditional plywood whose thickness is 12mm to infill.In this way, the one who stores the traditional formwork could still consume in the current or new project instead of material waste.
Green Formwork Panelized Slab Formwork
The proven steel panelized slab formwork with very fast shuttering process
About
GREEN FORMWORK panelized slab formwork allows fast as well as safe forming operations with a systematic assembly sequence. The low weight of the panels, compact dimensions and practical design of the system components facilitate non-tiring and ergonomic working operations.
It has been designed for standard use in constructing slabs with thicknesses up to 30 cm. The range of applications extends from residential construction through to real estate construction projects.
The systematic assembly sequence and lightweight system components made of steel accelerate working operations. In addition, the possibility of early stripping with the drophead system reduces on-site material requirements.Infill areas are reduced to an absolute minimum. Furthermore, the system makes a convincing case with an extensive range of safety and logistical accessories.
System Advantages
Beyond the limits.
Effortless Working
Low individual weights and practical dimensions are distinct advantages in daily formwork operations with GREEN FORMWORK . The low weight clearly makes a noticeable difference, among other things, in the work performance.
With dimensions of only 180 cm x
120 cm, the panels can easily be transported on the construction site e.g. also through door openings. When carrying the panels, the immediate work- ing area is always in view which greatly reduces the risk of tripping over.
Last but not least, as safety levels are enhanced when working with GREEN FORMWORK, site personnel do not tire so quickly.
Early Striking Mechanism
The heads are equipped with a 6 directions self locking system. Therefore, they can be connected very quickly and securely to the slab.
Removal of the panel is simply a matter of hitting the early stripping mechanism and then taking the head down.
Horizontal Tranportation
Through the props the workers could walk quite easily without any stops. Due to the no-tripods & horizontal brace design under this height for most of areas.
Fast forming
The recurring procedures accelerate work procedures and handling is quickly mastered even by personnel unfamiliar with the system.
Forming of standard fields is extremely simple with GREEN FORMWORK : after erecting the prop with gate brace, hang the panels on the props and use the erection tool to pull till the surface of the panel is at a horizontal position, then install the remaining props under the panel.
Infill Beams
The prop also provide the room for infill beam to meet the need of traditional formwork users in 12mm.
And the gap between the panels could be filled via tapes or T seam.In this way, the one who stores the traditional formwork could still consume instead of material waste.
Low on-site material requirements
Early stripping with the drophead and fast deployment of the panels in the next storey.
The drophead facilitates early stripping so that panels and main beams are quickly made available for sub- sequent concreting sections.
Depending on the slab thickness and strength of the concrete, stripping can partly be carried out after the concrete strength reaches 13MPa. One blow of the hammer releases the drophead and then remove the panels, leaving the props to support the concrete.
Early striking minimizes on-site material requirements because many system components can be used earlier for the next cycle. In addition, work on the construction site can also be better compensated; for example, through early stripping in bad weather or when there is spare capacity.
Description
Start to know Green Formwork
Steel Framing and Steel Components
The Frame could be Steel and Aluminium and other steel parts like props use Q345 and Q235 Material as the main material.
Aluminium Frame is available.
Support Head
With Green formwork early stripping mechanism, we can use only 1 set of panel + 2 sets of props/shroing system to cycle for the whole project which will save the cost on material compared with the traditional formwork with plywood.
A System Allows Early Stripping
The six directions self locking system ensures that the stability and safety.
Aux Beam
At the same time, the prop also provide the room for aux beam to meet the need of traditional formwork users in 12mm.
Cost Effective Ratio
Reasonable price with high cost performance ratio.
Advantages
Efficient
Installation Speed up to 100 sqm/man/day for post tension slab
Long Duration
Bamboo Plywood ensures that duaration is 50 times at least for casting on the surface.Steel frame with industrial glue could also protect boundary of the bamboo plywood to make sure the whole system is operational.
Environmental Friendly
Reduce the cost of materials, there is no need to cut the plywood for the most of areas.
Save Labour Cost
Could save 50% labour in a quite efficient and improve & boost the construction schedule.
Compatible With Traditional Plywood
With infill beam, the tradtional plywood is also possible to be involved. Only with the requirements for the thickness with 12mm. And green formwork could also work with other wall formwork and column formwork system.
Why is Green Formwork Considered Green Construction
The modern construction requires high efficiency and quality at the same time, well it could allow that happens in a reasonable range. Early stripping mechanism ensures safety, and the bamboo plywood ensures mutiple times than the normal plywood.Hence, That is why it is considered green construction.
How To Install Luriel Green Formwork system?
1.Adjust the steel props to the required length
2.Erect the steel props using gate brace
3.Hang the Panel to the Prop Head
4.Swing the lower end of the Panel to position using ADT
5.Insert, push, straighten and lock in the fourth Props
6.Repeat steps 3,4 & 5
Video
To be one of the beneficial clients since today.
Contact us
Satisfied? Click to contact us!
Wanke feicui Binjiang phase I, Huanhu Road, Guandu District, Kunming City, Yunnan Province,China+8615166012761
Luriel Shen Hien
Green Formwork
Projects
News
Contact
Address: Wanke feicui Binjiang phase I, Huanhu Road, Guandu District, Kunming City, Yunnan Province,China